Equipping 25 Houses After Emergency in Huarmey

by ASOCIACION EVANGELICA LUTERANA DE AYUDA PARA EL DESARROLLO COMUNAL - DIACONIA
Play Video
Equipping 25 Houses After Emergency in Huarmey
Equipping 25 Houses After Emergency in Huarmey
Equipping 25 Houses After Emergency in Huarmey
Equipping 25 Houses After Emergency in Huarmey
Equipping 25 Houses After Emergency in Huarmey
Equipping 25 Houses After Emergency in Huarmey
Equipping 25 Houses After Emergency in Huarmey
Equipping 25 Houses After Emergency in Huarmey
Equipping 25 Houses After Emergency in Huarmey
Equipping 25 Houses After Emergency in Huarmey
Equipping 25 Houses After Emergency in Huarmey

Project 29458 EQUIPMENT OF 25 HOUSES AFTER THE EMERGENCY IN HUARMEY was created to complement the project "Housing for the restoration of a normal and dignified life in Malvas, Huarmey Ancash province". At the beginning, the project had scheduled the construction of 24 homes, but seeing the need, financing was obtained for six more homes. The Johannes Gutenberg Cultural Association financed 24 homes and the Iglesia Luterana Evangélica Peruana-ILEP 06 homes.

The project included the support in the construction of two rooms for housing and a bathroom with hydraulic drag. The initial idea was for families to build their homes with adobe, as it is a predominant material in the intervention localities. However, in the execution of the project, it was known that the availability of land was not sufficient to elaborate the adobes required for construction, so the technical file was reviewed again and it was defined that the adobe houses have a collar of 14 wood of eucalyptus and houses of noble material (brick) have a steel collar.

To carry out the equipping of the houses, a brief survey was carried out, so it was identified that the families required mattresses since due to the floods and landslides they lost a large part of their assets. 91 mattresses of the “Paraíso” brand were purchased because their products offer guarantee and durability.

The results achieved were the following:

-       The construction of 30 houses, 11 of adobe and 19 of noble material (bricks and cement) has been achieved, benefiting 17 families located in Erajirca, 04 in Tuctu and 09 in Molinopampa. Each built house has two rooms and a bathroom with hydraulic drive.

-       91 mattresses have been distributed to the 30 families that built their homes, which were distributed considering the number of members in each family.

-       The capacity building of 81 families in the towns of Erajirca (31), Utcu (12) and Molinopampa (38) has been carried out in healthy habits and personal hygiene.

The project ended in 2018. so we trank everyone who made the results posibble. 


Attachments: Share on Twitter Share on Facebook

The project Equipment of 25 Houses after the Emergency in Huarmey was born in September 2017, it was promoted and disseminated through social networks, website and communication to direct and indirect friendships, which allowed that within 15 days we managed to have 82 payments of people and institutions identified and anonymous, concluding on September 30. The purpose of this report is to give an account to all the people and institutions that collaborated with their donations. This project was created to complement the project "Housing for the restoration of a normal and dignified life in Malvas, province of Huarmey Ancash", which began to be implemented in June 2017, as a result of the El Niño Costero phenomenon. As part of this project, 25 houses were originally built, but then the budget was obtained to build 5 more houses, making a total of 30 homes built. These homes were built in some cases in adobe and others in noble material, in three locations: Erajirca, Utcu and Molinopampa.


Attachments: Share on Twitter Share on Facebook
Jacinto has a 95% of progress of his house
Jacinto has a 95% of progress of his house

Although the donation received awarded GlobalGiving was recently received, thanks to the support of “Asociación Cultural Johannes Gutenberg”, 24 homes have been built:

In Erajirca, 02 families have completed the construction of their homes, 09 families have more than 90% progress, being close to roofing, 05 families have advanced more than 70% in the construction of their homes, and 01 family has an advance of 55%.

In Utcu, 02 families have already completed the construction of their homes, 01 family has an advance of 90% and 01 family is the 80% of progress.

In Molinopampa, there are 03 families that have been building their homes since the middle of October, they have a great progress to date; 01 family is in 90% of the construction of their home, another family is in 85% of progress, and the last family has 60% of the advance of the construction of their home.

For more information you could see the report attached.

Bricks seated down in Mardonio and Yesica's house
Bricks seated down in Mardonio and Yesica's house
Esmeralda&Jorge's house with adobe walls finished
Esmeralda&Jorge's house with adobe walls finished

Attachments: Share on Twitter Share on Facebook
Community meeting for land transfer
Community meeting for land transfer

In the villages of Erajirca and Utcu, 25 families lost their houses because they were located in unsafe areas, next to the river basins. So, when the landslide came, it took everything.

Maité and her family were one of the families who got a land transfer thanks to the quick decision of the inhabitants of Utcu. Now, they are building a safe house in the new plot of land they received, getting technical assistance from DIACONÍA to do so.

While they are recovering their livelihoods and housing little by little, they are coping with cold temperatures at night and lack of income. However, they have not lost the hope in a better future and the solidarity of their neighbors.

Share on Twitter Share on Facebook
 

About Project Reports

Project Reports on GlobalGiving are posted directly to globalgiving.org by Project Leaders as they are completed, generally every 3-4 months. To protect the integrity of these documents, GlobalGiving does not alter them; therefore you may find some language or formatting issues.

If you donate to this project or have donated to this project, you will get an e-mail when this project posts a report. You can also subscribe for reports via e-mail without donating.

Get Reports via Email

We'll only email you new reports and updates about this project.

Project Leader:
Pedro Veliz
Lima, Peru

Funded Project!

Combined with other sources of funding, this project raised enough money to fund the outlined activities and is no longer accepting donations.
   

Still want to help?

Support another project run by ASOCIACION EVANGELICA LUTERANA DE AYUDA PARA EL DESARROLLO COMUNAL - DIACONIA that needs your help, such as:

Find a Project

Learn more about GlobalGiving

Teenage Science Students
Vetting +
Due Diligence

Snorkeler
Our
Impact

Woman Holding a Gift Card
Give
Gift Cards

Young Girl with a Bicycle
GlobalGiving
Guarantee

Sign up for the GlobalGiving Newsletter

WARNING: Javascript is currently disabled or is not available in your browser. GlobalGiving makes extensive use of Javascript and will not function properly with Javascript disabled. Please enable Javascript and refresh this page.