Wall Fixtures
Wall Fixtures

The Dormitory construction work still on progress, but due to the existing & prevailing pandemic situation is slowing down the process. Facing building workers difficulty (masons, carpentors, painters, welders, helpers......). Some helped in the construction have migrated to their own place which hampers the completion.

Presently the wood work goes on together with the wall fixtures. The inside space seems to be spacious than the expected. The light shades used reflect light maximum possible. Aeration facilities allow adequate breeze for refreshing inside.

The fund constrains still exist & the contractor bills are to be paid & settled. We delay this for want of the money required. If some good willed donors come forward to understand & help us, it will be a great help to complete the task & allow children occupy the building.

Shelf Work
Shelf Work
Wood Work on Progress
Wood Work on Progress
Indoor Play Area
Indoor Play Area
Share on Twitter Share on Facebook
Enlarged View
Enlarged View

Project Report:

The Building Construction Project for the Mentally Challenged children's dormitory is on a slow pace due to the pandemic situation hampering the supply of building materials, labourers & other resources.

The building is about 80% finished with no remarkable external financial assistance. The fund raising efforts is not proved efficient & promising as expected.

Another issue is the escalation of the cost of the building materials from time to time monopolising the present COVID infection because we have started the project, with zeal we take risks & venture to finish it satisfactorily as far as possible with limited money in hand.

We still request the donors consider this issue & assist us monetarily to produce smiles on the face of the innocent children, who are already brain affected & helpless.

Any money gift big or small would be humbly & thankfully received.

Inside
Inside
Interior
Interior
Outside
Outside
Passage
Passage
Share on Twitter Share on Facebook
Being Built
Being Built

Building construction work on progress, building materials bought & dumped for ready use - come up to external finish level. Plastering work going on, workers kept busy with close monitoring, weather conducive.

Outstanding bills to be settled with the contractor, depending on funds from the common public Children are excited at the construction work.

Water shortage experienced, buying water from outside, as curing needs a lot of water consumption. Work delays due to the non-payment of the bills.

The prize of building materials soar up from the tentative estimate received. So far the safety of the worker assured. Adequate precautions are made for furtherance.

Materials Dumped
Materials Dumped
Outside View
Outside View
Plastering Work
Plastering Work
Busy on Toes
Busy on Toes
Share on Twitter Share on Facebook

 

Ground Floor work finished pending plastering & other related work. Ist Floor roof moulding work completed with enough curing of the concrete set-up laid. Interior structural work going on, scaffolding removed after testing the stability & the strength. Adequate building materials bought & kept on stock. The contractor & the Engineer vigilant on the continuity of the civil work, Part payment is made for the work done preparations going on for the 2nd floor work. Safety of life is ensured at every stage. The weather is conducive for mixing of the concrete & the curing thereof. Anticipating for funds from known & unknown ends.

Joseph Ponraj

Director

Share on Twitter Share on Facebook

We have just started digging the ground to make holes for foundation & pillar concerte work. This is the first stage & we are carrying it out. 

Rains distrub the progress of work, yet we make precautions & alternate methods to continue the work in a slow pace. 

The soil is still wet & clayee. It needs curing time to make it tight to hold the weight on it. 

The fund constrains is another snag to slow down the procedure. We are looking for generous & liberal hands to sacfold this activity.

Further progress on this issue would be initimated periodically. 

Share on Twitter Share on Facebook
 

About Project Reports

Project reports on GlobalGiving are posted directly to globalgiving.org by Project Leaders as they are completed, generally every 3-4 months. To protect the integrity of these documents, GlobalGiving does not alter them; therefore you may find some language or formatting issues.

If you donate to this project or have donated to this project, you can recieve an email when this project posts a report. You can also subscribe for reports without donating.

Sign up for updates

Organization Information

Gerizim Rehabilitation Trust

Location: BANGALORE, Karnataka State, - India
Website:
Facebook: Facebook Page
Twitter: @Not applicable
Gerizim Rehabilitation Trust
Joseph Ponraj
Project Leader:
Joseph Ponraj
BANGALORE , Karnataka State, India

Retired Project!

This project is no longer accepting donations.
 

Still want to help?

Find another project in India or in Clean Water that needs your help.
Find a Project

Learn more about GlobalGiving

Teenage Science Students
Vetting +
Due Diligence

Snorkeler
Our
Impact

Woman Holding a Gift Card
Give
Gift Cards

Young Girl with a Bicycle
GlobalGiving
Guarantee

Get incredible stories, promotions, and matching offers in your inbox

WARNING: Javascript is currently disabled or is not available in your browser. GlobalGiving makes extensive use of Javascript and will not function properly with Javascript disabled. Please enable Javascript and refresh this page.