This project intends to remodel the classrooms and sanitary services of a high school in Guanacaste, Costa Rica, with the objective to improve the quality of live and education of its 300 active students.
The classrooms and sanitary services of PCAHS are in a critical condition. There's no ceramic floor, ceiling, doors & windows are broken, there are no fans in the roof, painting is needed, and the only sanitary battery is on bad shape.
Based on priority, there'll be 2 phases: 1st phase: Ceramic floor will be placed, doors & windows replaced, and the sanitary battery repaired. 2nd phase: Fans will be installed, and painting jobs will be made, both inside and outside the classrooms.
This project will improve the quality of education of more than 300 active students every year, which at the same time, will improve their opportunities to achieve a better quality of life in the future.
This project has provided additional documentation in a PDF file (projdoc.pdf).