By Wirkom Fred | Project leader
Greetings to everyone.
It is not long when I reported aboutt the crucial crist during dry season last year. I am very delighted to reporot that within the last quarter we have been able to work on an additional catchment which was indicated in the last report. The purpose of this third catchment was to prevent the situatioin of serious water crises as we did in the previouis years.
It is sad that there was a land slide near the catchment but it did not affect the construction. We decided to connect the water and linked it to the main pipe running down from the first catchments. The community too is working very had as they came out and the piple line was clearded, dog and the pipes burried with a lot of joy.
I am glad to report that the community is very glad with what GG donors are doing to this project. I am sorry to report that because of report due time, the project pictures have not reached me at the time due for submitting the current porject report.
We have work on this project this week and I will made sure that the prvious and current project pictures are readily availblae for to posted in our next report.
At this time last year, the community was already facing water crisis but at the time they are okay and we will keep on with the extension and protection of the catchment areas.
Thank you very much for your continues support.