By David Sowerwine | Founder & Managing Director
Routine maintenance continues for the bridges that are accessible. Political turmoil still makes it difficult to reach many sites. EcoSystems is not the only group to be affected--the entire city of Kathmandu is short of fuel while the road links with India are blocked. Discussions are under way for site surveys in several parts of the country. A new 'hanger' design will be tested in one of the long bridges shortly, as part of the ongoing program to further improve the service life of the bearings.