By David Sowerwine | Managing Director
Currently three bridges are under construction at Bagapati, Ghadi, and Jaldevighat. All three bridges are assembled and are awaiting final arrangements by local authorities. The site at Ghadi is a replacement for a former bridge which was washed out in 2005 by one of Nepal's enourmous global-warming flood which are scouring its valleys. At the moment people are fording the river like these women carrying cut grass in this photograph taken at Ghadi.
Read the three-page article about us in the Feb 28, 2007, Almanac newspaper.
Links:
By David Sowerwine | Managing Director
By David Sowerwine | Managing Director
Project reports on GlobalGiving are posted directly to globalgiving.org by Project Leaders as they are completed, generally every 3-4 months. To protect the integrity of these documents, GlobalGiving does not alter them; therefore you may find some language or formatting issues.
If you donate to this project or have donated to this project, you can receive an email when this project posts a report. You can also subscribe for reports without donating.


