Safe, reliable water for 400+ learners in SA

by A Spring of Hope
Play Video
Safe, reliable water for 400+ learners in SA
Safe, reliable water for 400+ learners in SA
Safe, reliable water for 400+ learners in SA

Project Report | Jul 24, 2026
Borehole Rehabilitation Project - Maatla Primary S

By Nelly Mofokeng | Executive Director

Learners watering vegetable crops
Learners watering vegetable crops

Introduction

 

We are pleased to provide an update on the borehole rehabilitation project at Maatla Primary School, made possible through the generous support of GlobalGiving.

Maatla Primary School serves 444 learners in Finale Village (The Oaks), Limpopo Province. Prior to this project, the school's borehole had experienced a significant decline in water yield, forcing the school to purchase water for cooking and handwashing while limiting its once-thriving vegetable garden. The rehabilitation of this borehole remains a critical intervention in restoring water security for the school community.

 

Phase One Completed: Borehole Assessment

The first phase of the project has now been successfully completed.

 

A specialist borehole contractor carried out a comprehensive technical assessment to determine the cause of the reduced water supply.

 

Assessment Findings

The assessment produced encouraging results.

Rather than the borehole running dry, the investigation found that:

  • The borehole still contains an adequate water supply.
  • The existing pump installation is undersized for the borehole conditions.
  • The previous installer used thicker rising pipes which require greater pumping pressure.
  • The installed pump does not generate sufficient pressure to lift the available water efficiently.
  • The borehole requires a 1.1kW pump to restore adequate water production.

This means the project does not require drilling a new borehole at this stage, significantly reducing both cost and environmental impact while making use of the existing water source.

 

Current Progress

Following the assessment:

Borehole inspection completed

Technical diagnosis completed

Correct replacement pump specified

New 1.1kW pump ordered

Unfortunately, delivery of the replacement pump has been delayed by the supplier, which has postponed the final installation.

To ensure the school is not left completely without water, the existing system has been blown out and temporarily recommissioned. Although it provides only a limited water supply, it allows the school to continue meeting its most essential daily needs while awaiting the new equipment.

 

 

Remaining Work

 

Once the replacement pump has been delivered, the contractor will complete the following activities:

  • Remove the existing pump from the 55-metre borehole.
  • Test the control box, motor and pump components.
  • Install the new 1.1kW pump.
  • Commission and test the complete system to ensure reliable water delivery.

Following installation, the school is expected to regain a dependable and sustainable water supply for learners, staff and the school nutrition programme.

 

Continued Commitment from the School

Despite the current limitations in water availability, the dedication shown by the school community has been truly inspiring.

Teachers, learners and staff have continued maintaining their vegetable gardens using the limited water available. While production has temporarily been scaled down, the school remains committed to growing fresh vegetables to supplement meals served through the school nutrition programme.

The gardens continue to provide valuable practical learning opportunities while reinforcing the importance of food security, environmental stewardship and resilience.

 

Looking Ahead

The completion of the final installation will enable the school to:

  • Restore a reliable water supply for 444 learners and staff.
  • Revive vegetable production at full capacity.
  • Improve hygiene and sanitation throughout the school.
  • Reduce expenditure on purchased water.
  • Strengthen the sustainability of the school nutrition programme.

 

This project represents much more than infrastructure—it is an investment in learner health, nutrition, education and dignity. As outlined in the original motivation, restoring reliable water is the foundation for improved sanitation, school gardening and broader educational development.

 

Photo Gallery

Photo1: Learners continue watering vegetable crops despite the limited water supply, demonstrating resilience and commitment to the school garden.

Photo 2: Healthy leafy vegetables growing under the shade-net structure maintained with careful water management.

Photo 3: Learners participate in practical agricultural learning as they harvest vegetables from the school garden.

 

We extend our sincere gratitude to GlobalGiving and Mr Jacques Claassens

 who contributed to making this project possible. Your support is helping Maatla Primary School move closer to restoring reliable access to safe water while strengthening food security, learner wellbeing and sustainable school development.

We look forward to sharing a final completion report once the new pump has been installed and the borehole is fully operational.

Healthy leafy vegetables
Healthy leafy vegetables
Learners participate in agricultural learning
Learners participate in agricultural learning
Share on Twitter Share on Facebook

About Project Reports

Project reports on GlobalGiving are posted directly to globalgiving.org by Project Leaders as they are completed, generally every 3-4 months. To protect the integrity of these documents, GlobalGiving does not alter them; therefore you may find some language or formatting issues.

If you donate to this project or have donated to this project, you can receive an email when this project posts a report. You can also subscribe for reports without donating.

Sign up for updates

Organization Information

A Spring of Hope

Location: West Palm Beach, FL - USA
Website:
Facebook: Facebook Page
X / Twitter: Profile
Project Leader:
Joanne Young
Executive Director
West Palm Beach , FL United States
$5,403 raised of $10,000 goal
 
1 donations
$4,597 to go
Donate Now

Help raise money!

Support this important cause by creating a personalized fundraising page.

Start a Fundraiser

Learn more about GlobalGiving

Teenage Science Students
Vetting +
Due Diligence

Snorkeler
Our
Impact

Woman Holding a Gift Card
Give
Gift Cards

Young Girl with a Bicycle
GlobalGiving
Guarantee

Get incredible stories, promotions, and matching offers in your inbox

WARNING: Javascript is currently disabled or is not available in your browser. GlobalGiving makes extensive use of Javascript and will not function properly with Javascript disabled. Please enable Javascript and refresh this page.