By Michel Maupoux | Program Manager, Green Empowerment
The team comprised of 4 students from the Norhtwestern University chapter of Engineering for a Sustainable World (ESW) and Michel Maupoux from Green Empowerment, was on site for 4 weeks ending July 20, 2010, to participate in the construction of a dual ram pump system in Tres Hermanos. The project was successfully completed in that time.
As I was out of commission for two weeks due to dengue fever, the students did a great job of participating and documenting the whole installation, showing that installing the pumps themselves is only a part of the work. This particular system was comprised of a network of pipes for lifting water and for its distribution, made of 6km (~4 miles) of pipes.
Attached is the system construction report filed by the students, with photos showing the hard work and its results.
Enjoy, and thanks for your support.
Project reports on GlobalGiving are posted directly to globalgiving.org by Project Leaders as they are completed, generally every 3-4 months. To protect the integrity of these documents, GlobalGiving does not alter them; therefore you may find some language or formatting issues.
If you donate to this project or have donated to this project, you can receive an email when this project posts a report. You can also subscribe for reports without donating.