School Rehabilitation & Maintenance Program

by Waves of Hope
Play Video
School Rehabilitation & Maintenance Program
School Rehabilitation & Maintenance Program
School Rehabilitation & Maintenance Program

Project Report | Jun 20, 2019
Getting Organized for High School Updates

By Jamie Collum | Project Manager

New roof in classroom at high school
New roof in classroom at high school

As of right now, Waves of Hope does not have any ongoing school rehab projects underway as we are in the middle of the school year and try to avoid disruption through construction works if it can be avoided. We did however recently update some of the high school roof which had some leaks and are planning for a much larger high school improvement program this winter. 

Phase One 

The back portion of the school yard is a high traffic area that is dry and dusty in the dry season and muddy in the wet season. The toilets in back are in need of repair and painting, while the main footway area could really use some walkways, planting and repair. 

The school restrooms are also in need of repair and maintenance including repainting, replacing broken water pipes from the cistern to the tank and from the tank to the hand-washing area, and replacing the handwashing sink. There is also a need to build stairs at the south west end of the new classrooms building.

Total Estimated Budget for Phase One Project: 80,000 cordoba ($2,462 USD)

Phase Two Service Retreat – Outdoor Plaza / Recess Seating Area


The second phase of the Manzanillo High School improvement project is a proposal to construct an outdoor plaza seating area. As most of the school grounds is open dirt, the majority of the outdoor areas are dusty in dry season and muddy in the wet season. We hope that by constructing an outdoor area using the same blocks as the walkways we will be able to reduce the amount of mud and dirt that is tracked throughout the school and provide an aesthetically appealing area for social congregation, studying and lunch breaks. The trees in this part of the school provide a natural shaded area that is currently not being utilized.

Total Phase 2 Estimated Cost: 110,000 (3,385 USD)


Attachments: Share on Twitter Share on Facebook

About Project Reports

Project reports on GlobalGiving are posted directly to globalgiving.org by Project Leaders as they are completed, generally every 3-4 months. To protect the integrity of these documents, GlobalGiving does not alter them; therefore you may find some language or formatting issues.

If you donate to this project or have donated to this project, you can receive an email when this project posts a report. You can also subscribe for reports without donating.

Sign up for updates

Organization Information

Waves of Hope

Location: Burlington, ON - Canada
Website:
Facebook: Facebook Page
X / Twitter: Profile
Project Leader:
Jamie Collum
Burlington , ON Canada

Funded Project!

Combined with other sources of funding, this project raised enough money to fund the outlined activities and is no longer accepting donations.
   

Still want to help?

Find another project in Nicaragua or in Education that needs your help.
Find a Project

Learn more about GlobalGiving

Teenage Science Students
Vetting +
Due Diligence

Snorkeler
Our
Impact

Woman Holding a Gift Card
Give
Gift Cards

Young Girl with a Bicycle
GlobalGiving
Guarantee

Get incredible stories, promotions, and matching offers in your inbox

WARNING: Javascript is currently disabled or is not available in your browser. GlobalGiving makes extensive use of Javascript and will not function properly with Javascript disabled. Please enable Javascript and refresh this page.