Equip a sickle cell community lab in Cameroon

by Fr John Kolkman Foundation
Equip a sickle cell community lab in Cameroon
Equip a sickle cell community lab in Cameroon
Equip a sickle cell community lab in Cameroon
Equip a sickle cell community lab in Cameroon
Equip a sickle cell community lab in Cameroon
Equip a sickle cell community lab in Cameroon
Equip a sickle cell community lab in Cameroon
Equip a sickle cell community lab in Cameroon
Equip a sickle cell community lab in Cameroon
Equip a sickle cell community lab in Cameroon

Project Report | Dec 20, 2017
Lab Equipment Update: Solar Electricity Installed

By Richard Apongnde | Program Administrator

Testing Solar Components
Testing Solar Components

Background

As part of equiping the clinic laboratory, we quickly realized dependence on commercial electrical power was not viable and reliable, and installation not timely. The cost of a transformer and bringing electrical current from a high tension cable to the site over a 0.75 km distance was not affordable. Commercial electrical supply is not reliable:fluctuation in wattage and amperage, unpredicatble power supply interruptions for indefinate periods. To overcome this obstacle we embarked on a solar powered electrical system.

Solar Powered Electrical System

The 4KW electrical system comprises 2 x 400W solar pannels, a battery bank (800ah), PV inverter, circuit breaker, unit distributor, mounting board, circuit controllers and cables for wiring and outlet sockets. Local elctricians and carpenters were utilized in the assembly and installation. Pictures of the installation process accompany this report.

Performance

The rated output of the system was 4,000 watts (4KW). The inverter has two phase outputs, 240V and 120V. The 120V rated phase is in use. The actual voltage, when the system was powere, was recorded at 118V. Laptops, have been powered, from various outlets, 35 x 40 W  lamps are running with no electrical fluatuations in addition to appliances in use at the facility. The entire facility (not just the lab) is a beneficialry of the system.

A pressing iron rated at 1,500 W was tested. There was pouwer outage after about 5 minutes of continuos heating. We therefore recommeded no such appliances be used. 

With this installation the Foundation is absolutely electrical utility free.

Reroute

It should be noted here that when the project was conceived, isntallation of the electriical systemn was not included in the cost of equipment. But having realized that a laboratory cannot run successfully withot a reliable source of power it was necessary to reroute and have a power supply system in place.

What Next

The Foundation is now embarking on the aquisition of the hematology analyzer, to complete the hematlogy unit of the laboratory. We are therefore coming to our donors and well wishers to appeal for the last phase.

Appreciation.

We are greatful for all who have contributed towards the installation of this system. We heartily thank you for providing hope to our sickle cell community through this unique component of comassionate care. 

Solar Circuit (Control) Board
Solar Circuit (Control) Board
Solar Dashboard
Solar Dashboard
Panel mounting on clinic roof
Panel mounting on clinic roof
Battery Bank Installation
Battery Bank Installation
Lights on Clinic Corridor at  9pm
Lights on Clinic Corridor at 9pm
Share on Twitter Share on Facebook

About Project Reports

Project reports on GlobalGiving are posted directly to globalgiving.org by Project Leaders as they are completed, generally every 3-4 months. To protect the integrity of these documents, GlobalGiving does not alter them; therefore you may find some language or formatting issues.

If you donate to this project or have donated to this project, you can receive an email when this project posts a report. You can also subscribe for reports without donating.

Sign up for updates

Organization Information

Fr John Kolkman Foundation

Location: Chicago, IL - USA
Website:
Facebook: Facebook Page
Twitter: @fjksickle
Fr John Kolkman Foundation
neba ambe
Project Leader:
neba ambe
Executive Coordinator
Chicago , IL United States

Retired Project!

This project is no longer accepting donations.
 

Still want to help?

Find another project in Cameroon or in Child Protection that needs your help.
Find a Project

Learn more about GlobalGiving

Teenage Science Students
Vetting +
Due Diligence

Snorkeler
Our
Impact

Woman Holding a Gift Card
Give
Gift Cards

Young Girl with a Bicycle
GlobalGiving
Guarantee

Get incredible stories, promotions, and matching offers in your inbox

WARNING: Javascript is currently disabled or is not available in your browser. GlobalGiving makes extensive use of Javascript and will not function properly with Javascript disabled. Please enable Javascript and refresh this page.