By Opart Suamsiri | Personal assistant of Project Leader
Soil Erosion Repair & Prevention Work
In March 2019, the restoration work is underway to install drainage passage under the gabion wall. The workers are compacting the soil under the retaining wall of the reinforced concrete base. Individual gabion baskets are placed to form an integrated structure.The gabion retaining wall is constructed to stabilize surface slopes.
The work schedule is back on track and the time lost due to rainfall is recovered. The overall site progress is estimated at 35% and the work is scheduled to complete in mid-May 2019. Lastly, thanks to all donors for your care and support for our school. The school’s funds for restoration of damaged buildings are still needed. Some classroom buildings located on such area affected by landslide are inaccessible and currently pending the risk exposure assessment.
Project reports on GlobalGiving are posted directly to globalgiving.org by Project Leaders as they are completed, generally every 3-4 months. To protect the integrity of these documents, GlobalGiving does not alter them; therefore you may find some language or formatting issues.
If you donate to this project or have donated to this project, you can receive an email when this project posts a report. You can also subscribe for reports without donating.