By Dean Sinco | Project Director
After months of construction, the Estudio Damgo IV has been taking its final form already. The last few phases of constructions is on.
The Ceiling is taking its shape already. Designs and other constructional requirements were prioritized. All necessary preparations and evaluations were done to ensure the quality of the structure.
The Downspouts were also installed. Such part of the structure is necessary in relation to the type of weather the Philippines has. Pipes were strategically placed and designed to seamlessly blend with the bamboo materials.
Bamboo was also used for the Trellis of the ED4. It is sturdy enought to hold whatever plant or ornaments be attached to it.
Project reports on GlobalGiving are posted directly to globalgiving.org by Project Leaders as they are completed, generally every 3-4 months. To protect the integrity of these documents, GlobalGiving does not alter them; therefore you may find some language or formatting issues.
If you donate to this project or have donated to this project, you can receive an email when this project posts a report. You can also subscribe for reports without donating.