By ADAMA Epse WEGA | Project Leader & AGAPE Team
In order to improve the living conditions at AGAPE Center, we have started work on the construction of a borehole and an external toilet block.
Work on the construction of an external toilet block and a borehole with a water tower is progressing well for the AGAPE Centre.
1) External toilet block
The installation, foundation and raising of the walls have already been completed for this part of the work. The walls are just waiting for the chain-laying to be done so that the structural work is 100% complete. I invite you to see the pictures of this block from different angles.
2) Drilling with castle
For this part, the drilling itself has already been done and allows us to have water by simply connecting a pipe to the submerged pump. As for the water tower, a square excavation with a depth of 2 metres and 3 metres per side was made. This excavation was then fitted with a raft which will have to support the load of the reservoir. I also invite you to see the pictures of this structure.
Project reports on GlobalGiving are posted directly to globalgiving.org by Project Leaders as they are completed, generally every 3-4 months. To protect the integrity of these documents, GlobalGiving does not alter them; therefore you may find some language or formatting issues.
If you donate to this project or have donated to this project, you can receive an email when this project posts a report. You can also subscribe for reports without donating.