By Pamela Pinto | Development Director
With winter in full force here and still digging out from the worst storm in 5 years, much has been done with getting our first Bee Island built. The ground has been leveled and materials have been ordered. The design of the Bee Island includes a hanging hive and benches for observation. The view from the structure looks out onto flower beds, the hillside and the rolling hills in the distance and with no leaf cover a glimpse of the river. The foundation of the island and some of the building was scheduled for the weekend of February 21 - 23, 2014, but that has had to be postponed due to the snow cover. We can't wait for the snow to melt, the ground to get softer and to get the building started.
Links:
Project reports on GlobalGiving are posted directly to globalgiving.org by Project Leaders as they are completed, generally every 3-4 months. To protect the integrity of these documents, GlobalGiving does not alter them; therefore you may find some language or formatting issues.
If you donate to this project or have donated to this project, you can receive an email when this project posts a report. You can also subscribe for reports without donating.


