By Dean Sinco | Project Leader
Revisions are necessary most of the time in order to welcome fresh and arising ideas during the implementation of a desired project. Such statement is also applicable to the construction of the Foundation Preparatory Academy Science Wing.
Construction work has been suspended recently due to the slight revisions for the enhancement of the building’s aesthetics. Part of the process is to improve and revise the construction more specifically for the gate entrance area.
As part of the said revision for the entrance gate and overall aesthetics of the building, grills are now being fabricated and will later be installed once the revised drawing is completed.
Also in line with the purpose of improving the facade, the institution sent another proposal to the local electric energy provided and the City Engineer’s Office to move the existing electrical posts located on the far end part of the property line since the three posts are blocking the main entrance gate and drop-off curb. Meanwhile, a proposal on the underground wiring for the communication lines is being drafted as well in order to furthermore improve the look of the building.
Project reports on GlobalGiving are posted directly to globalgiving.org by Project Leaders as they are completed, generally every 3-4 months. To protect the integrity of these documents, GlobalGiving does not alter them; therefore you may find some language or formatting issues.
If you donate to this project or have donated to this project, you can receive an email when this project posts a report. You can also subscribe for reports without donating.