By Anna Garwood | Project Leader
A parts list, and plans:
Uses only inexpensive and standard components:
1. Small trailer axle ball bearing (really barrel). The stress of rolling this machine would be no threat for these bearings, as they are intended to carry a much heavier load.
2. Standard steel tubing and flange.
3. A bicycle wheel acts as a 28 inch low cost pulley.
4. Wooden lateral wings to make a Venturi flow control.
Designer will complete the first prototype in their shop, and then travel to Columbia to help for the initial installation, fine tuning, and tech training-- TBD.
A team of engineers from our in-country partner APROTEC will work with the community to install the equipment and do follow up tests and monitoring for at least 1 year.
Project reports on GlobalGiving are posted directly to globalgiving.org by Project Leaders as they are completed, generally every 3-4 months. To protect the integrity of these documents, GlobalGiving does not alter them; therefore you may find some language or formatting issues.
If you donate to this project or have donated to this project, you can receive an email when this project posts a report. You can also subscribe for reports without donating.