By Dean Sinco | Project Leader
Months after the topping off ceremony, the University is geared towards the opening of the Edgar Sevilla Pasimio Memorial Clinic as the building construction is moving towards full completion.
Aside from the fact that the building construction is almost done, the latest updates include the installation of air conditioning units and glass windows.
Currently, floors are being polished and the final coating of walls is being applied. Also, doors and lower floor windows have been installed.
On the other hand, painting works at the exterior of the building is almost done. This was followed by installation of signages and the koi pond along with the landscaping works.
Mechanical pipings for gas were installed at the Kennel - the food service center beside the clinic.
At the clinic area, air conditioning units were put into place along with the exhaust pipes. Ceiling works, clinic and pharmacy cabinets were also installed recently.
Lastly, waiting lounge furnitures are now being fabricated.
Just a few more works and the building’s aesthetic aspect will be completed, especially for the interior, and will lead to the building’s inauguration in a few months.
The Edgar Sevilla Pasimio Memorial Clinic will become the simulation clinic for the FU College of Nursing and at the same time, serve the needs of the immediate community.