By Srikanth Mandumula | Project Leader
The Head Master of the School in October 2022 came up with a proposal to build a separate Toilet Block for the Boys . The existing one was often in disrepair and the students had to go to the nearby fields to relieve themselves.
In coordination with the Village Head - Sarpanch and the Parents Committee , Empowerment through Education started the project in late October 2022 and successfully completed in Feb 2023 .
Toilet compries six urinals and one WC . A continuos water supply is provided by a dedicated underground piping from the main tank . An overhead tank provides storage water for maintaining a clean envieonment for the students .
A dedicated sprtic tank was built adjacent to the Block.
The construction was well pubicised in the village and he local media a as well.
Project reports on GlobalGiving are posted directly to globalgiving.org by Project Leaders as they are completed, generally every 3-4 months. To protect the integrity of these documents, GlobalGiving does not alter them; therefore you may find some language or formatting issues.
If you donate to this project or have donated to this project, you can receive an email when this project posts a report. You can also subscribe for reports without donating.