We are excited to report that the Africa Schoolhouse team has nearly completed the first two buildings of the Milembe Secondary School dormitory compound. Thank you for all you have done to make this a reality! The team is now putting the finishing touches on the dormitory, including installing the bunkbeds and cabinets in each room and choosing lighting fixtures. Teachers and students have expressed how much they love the beautiful design and construction. Head Teacher Florencia expressed her thanks for the “wonderful” new girls’ dorm: “It is so beautiful!”
Milembe students are excited about the dorm. A group of girls worked with the Africa Schoolhouse team and gave feedback on the bunkbeds. They tested the height of the ladders, safety rail, and overall feeling of the bed, giving them all vigorous thumbs up. Elizabeti said she couldn’t wait to sleep there! The dorm is light filled, including areas at the roof peak that allow daylight to filter in. And the cheerful interior painting, with blue accent walls in the girls’ rooms creates a beautiful living environment.
The Africa Schoolhouse team is also now completing work on the hygiene building, which houses the composting latrines, shower stalls, and a beautiful curved row of sinks where the girls will be able to wash faces and brush teeth in front of a stone wall and planter filled with local flowers. Water for the sinks will come from an in-ground rainwater harvesting system housed between the dorm and the hygiene building. The team is now completing work on the interior and will begin tiling the composting latrine and shower stalls next week. Work is really moving fast!
Thank you for all you have done to make the dorm compound possible. Please stay tuned! We plan to begin the Dining Pavilion with kitchen in the next few months! We hope to have things ready for girls to move in to begin the new school year in 2020. Asanteni! (Thank you all!)
Links:
Project reports on GlobalGiving are posted directly to globalgiving.org by Project Leaders as they are completed, generally every 3-4 months. To protect the integrity of these documents, GlobalGiving does not alter them; therefore you may find some language or formatting issues.
If you donate to this project or have donated to this project, you can receive an email when this project posts a report. You can also subscribe for reports without donating.
Support this important cause by creating a personalized fundraising page.
Start a Fundraiser