Classroom construction finished

We have very exciting news reaching us from the Mary John Primary School in Leer, Southern Sudan! The construction work on the block of 5 classrooms has now been completed. All that is left to be done is to fully equip the classrooms with desks & benches. 

The 5 classrooms are in two separate blocks, one with 3 classrooms and the other with 2. The construction work was carried out by our local NGO partner Assistance Mission for Africa (AMA) who specialize in construction work in and around Leer. The classrooms were built to the standard Government of Southern Sudan specifications. 

As mentioned above, the project is not yet complete as we have to finish equipping the inside of the classrooms with the desks & benches needed for all 5 classrooms. The materials for this job have been shipped by boat from Juba to the school and a local carpenter is currently working with the Mary John school's PTA to finish putting them together and get them in place. We are hopeful that this will be completed in the next week and as of then the project will be considered complete. 

Many thanks for all your support! 

 

May 20, 2010

Classroom materials arriving in Leer

Iron sheets, timber beams, wire mesh
Iron sheets, timber beams, wire mesh

The materials for the 5 classrooms have now arrived in Leer. Although we do not have all the funds in place yet, the decision was taken by Trustees, in conjunction with our local NGO partners AMA, to get the materials transported from Khartoum to Leer before the beginning of the rainy season. The journey takes at least a week and many of the roads would be impassable once the rains arrive. Conversely, construction is actually easier during the rainy season as before then the clay soil is far too dry and hard.

So whilst we now have the materials ready in the compound, we still have all the labour and production costs to raise. We are now doubling our fundraising efforts to try and reach our target as quickly as possible so we can see the classrooms built and being used by the students of Leer Primary.

Cement bags
Cement bags
Doors and window frames
Doors and window frames

About Project Reports

Project Reports on GlobalGiving are posted directly to globalgiving.org by Project Leaders as they are completed, generally every 3-4 months. To protect the integrity of these documents, GlobalGiving does not alter them; therefore you may find some language or formatting issues.

If you donate to this project or have donated to this project, you will get an e-mail when this project posts a report. You can also subscribe for reports via e-mail without donating or by subscribing to this project's RSS feed.

Funded

Combined with other sources of funding, this project raised enough money to fund the outlined activities and is no longer accepting donations.

Still want to help?
Find another project in South Sudan or in Education that needs your help.

Organization

GUA Africa

Swindon, Wiltshire, United Kingdom
http://www.gua-africa.org

Project Leader

Kate Gumm

Swindon, Wiltshire United Kingdom

Where is this project located?

Map of Build Classrooms for 2000 Children in South Sudan