Build victory gardens for 200 Ethiopian students

by Consortium for Capacity Building (CCB), University of Colorado at Boulder
Vetted
Apr 1, 2013

In Situ water harvesting shows results by reviving formerly dry streams

Oxen drinking from a revitalized stream
Oxen drinking from a revitalized stream

One of the impacts of environmental degradation in the village of Atebes, as in many Ethiopian highlands have been extreme soil erosion and consequently, the drying up of streams. When soil is washed down stream, the bare rocks do not absorb the water during the rainy season. The life span of the streams became short months following the end of the rainy season. Women and children spent several hours a day trekkingto collect water.

One of the interventions we tried in 2012 was trying to stop the rushing floods during the rainy season by building check dams using gabion walls on the upper slope of the dried stream. During the  the summer rains of 2012 the largest gabion stracture was filled with sand. We have photos of before and after the check dam strucutre and the stream to show the differnece.

As the picture of April 2012 shows, a little girl is trying to fill her water container (plastic Jerican) with a tiny can. It took her almost an hour to fill it with water. We took a picutre on a similar site in February this year. The stream did not only improve but the two oxen's body is half inside the water. We are told that not only are the farmers fetching water from her but , even farmers from down stream are coming her to fetch water. The farmers are in the process of devleing laws on water mangement. The spring is now cleaned and fenced. We are also asked by the farmers to help with the purchse of additional gabion wires and the farmers will use their labor to collect stones and fill it. 

When the stream is fully recharged, we believe that that farmers will not only have water for humans and animals but also for spreading their gardens close to the spring.

the first gabion check dam half filled with sand
the first gabion check dam half filled with sand
the main check dam filled with sand after the rain
the main check dam filled with sand after the rain
The stream before the  building of the check dam
The stream before the building of the check dam
the crick before the check dam was built
the crick before the check dam was built
gabion wires to build check dams
gabion wires to build check dams
Comments:

About Project Reports

Project Reports on GlobalGiving are posted directly to globalgiving.org by Project Leaders as they are completed, generally every 3-4 months. To protect the integrity of these documents, GlobalGiving does not alter them; therefore you may find some language or formatting issues.

If you donate to this project or have donated to this project, you will get an e-mail when this project posts a report. You can also subscribe for reports via e-mail without donating or by subscribing to this project's RSS feed.

Get Reports via Email

We'll only email you new reports and updates about this project.

Project Leader:
Tsegay Wolde-Georgis
Dr.
Boulder, CO United States
$9,135 raised of $30,000 goal
 
219 donations
$20,865 to go
Donate Now Add Project to Favorites

Help raise money for this important cause by creating a personalized fundraising page for this project.

Start a Fundraiser

Learn more about GlobalGiving

Teenage Science Students
Vetting +
Due Diligence

Snorkeler
Our
Impact

Woman Holding a Gift Card
Give
Gift Cards

Young Girl with a Bicycle
GlobalGiving
Guarantee

Sign up for the GlobalGiving Newsletter