Mar 7, 2019

NEXT PHASE OF WATER PROJECT STARTED FEBRUARY 2019

2 of 5000L storage and the 3ft concrete platform
2 of 5000L storage and the 3ft concrete platform

It’s a year since the commissioning of the first phase of water supply project in February 2018 which provides potable water to 13,000 rural dwellers in Nigeria. DFRHCE is glad to announce that the next phase of the water project commenced in February, 2019.

The 2018 Globalgiving donations of $2631.55 was not sufficient to start a meaningful installation of the solar panel phase. However, the increasing burden (the population it serves continues to increase) on the existing water source has made our engineer to think outside the box. The team has designed a means of extending the water supply to one adjoining community “Igbira Farm Settlement Community”. This reduces the burden on our already existing water platform which has 10,000L with supply outlets in two platforms of 4 taps.

This new arrangement will add two storage tanks each of 5000L capacity to the existing 10,000L storage to have a total of 20,000L storage capacity. Besides, this new 10,000L storage on top of a three feet concrete platform will ensure a continuous flow of water into the storage from the artesian water source. Each storage is ten feet high placed on a three feet high concrete platform. Together, pressure from this 13 feet high column of water can drive water flow to the first two immediate communities for 24 hours without any mechanical support. However, solar power is still needed to enable us drive the water to all our index communities.

The water from the storage will in turn be channeled through underground pipes to other parts of the immediate and adjoining communities. This will further reduce the current burden on the present water storage, end irregular water availability and increase water supply to another 7000 rural dwellers in adjoining communities.

With most of the materials already on ground, implementation for this phase is expected to be completed by the end of March 2019 if there is no disturbance as a result of the ongoing national elections in Nigeria.

Dako Foundation for Rural Healthcare and Education (DFRHCE) wishes to thank you- our esteemed donors for your immense support so far in completing the first phase and commencing the second phase of the water project. We still need your continuous support to get to our desired destination; solar power installation phase and the extension of water to all our index communities.

Rationale for the water project

In Nigeria, access to safe and regular water supply is a major challenge as clean and regular water supply have not kept pace with the rapid rate of population increase. Water scarcity, poor water quality and inadequate sanitation negatively impact food security, livelihood choices and educational opportunities for poor families and lead to water borne diseases such as diarrheal, cholera, typhoid, hookworm etc. This situation is particularly worse in underserved rural communities where most of the children die due to preventable diseases associated with inadequate water supply, sanitation and hygiene. This situation is very rife in the communities where DFRHCE implements a water project to serve 13,000 rural dwellers.

Overall Project Overview

Construction of a 40 feet (ft) high scaffolding at the artesian water source in order to carry 10,000Litres of water reservoir, solar panel installation and water distributed through extension pipes to six (6) other neighbouring communities at a distance of 5 kilometers.

Project Location: Iyerekhu, Edo State, Nigeria.

Project Reach: The project is expected to provide water supply to reach 13000 people in total; 6000 people in its primary community and another 7000 residents through its water extension from the source to neighbouring communities.

Phase 1 Project Implementation Successes.

The first phase of the water project has been successfully completed and commissioned. Activities carried out in this first phase include.

         Project site preparation and maintenance

         Fully installed artesian water source with completed plumbering

         Construction of basement for water scaffolding

         Construction of a 40ft high steel scaffolding

         Provision of 10,000L water storage

         Extension pipes to two community water sources.

         Completed two fully tiled community water extension platforms

         Completed; four community taps

Next phases of the water project:  Concrete platform and Water Extension through pipes

         Concrete platform and water extension through pipes (current phase)

This aimed to provide continuous and increased water supply to another 7000 rural dwellers including farmers and school children who continuously get late to school due to long distance walk to fetch water several times daily before attending school etc. This water extension project is expected to benefit communities and end their lingering inability to access regular potable water supply.  Being the first of its kind in providing water supply across communities. With continuous support, we hope to replicate this project in other communities that lack access to water supply.

Our donation link https://www.globalgiving.org/projects/potable-water-supply-to-13000-villagers-in-nigeria/ is still active on GlobalGiving and opens for donations.  Please donate now. The donations would help ensure timely and successful completion of the next phases of the water project to 13,000 rural dwellers.

Thank you for your donations towards providing potable water to 13,000 rural dwellers in Nigeria. The successes recorded so far have been made possible due to widespread donations from all our donors in the UK, Canada, Australia, Europe, America, South Africa and Nigeria. Your donations, irrespective of the amount, helped us achieve these successes. While we hold all donors in high esteem, we will as well not forget to appreciate one of our major donors, Dako Medical Centre Limited (Nigeria) for its immense contribution towards the completion of the first phase of this project especially during times of low funding challenges and the urgent need to provide water to the immediate host community.  We look forward to continued support from all our donors as we further provide potable water to underserved communities in Nigeria.

Thank you,

Dr Mamudu Dako

Founder/CEO, Dako Foundation for Rural Healthcare and Education (DFRHCE).                                          

The two water storage of 5000L each.
The two water storage of 5000L each.
Another picture of the storage tanks on platform
Another picture of the storage tanks on platform
Dec 10, 2018

Increasing Financial Response from Donors During the Ongoing 2018 End of Year Donation Period

community water source: terminal 1
community water source: terminal 1

Dako Foundation for Rural Healthcare and Education is hopeful that the second phase (Solar Panel Installation) of the water project will become a reality soon if our donors’ response to the call for donation is sustained. Some of our donors are beginning to respond to donation for the ongoing 2018 GlobalGiving end of year donation period the water project.

Since the commissioning of the first phase of water supply project in February 2018, to provide potable water to 13,000 rural dwellers in Nigeria, rural residents continue to benefit from the water supply as this has continue to be a major source of water to its primary community and environs. Also, there is an increasing burden on the water source as the population it serves continues to increase. The challenges of irregular power supply and the cost of over reliant on generator further buttress the urgency to complete the second phase (solar panel installation) of the project, however, funding has been a major setback. This second phase of water project upon completion will ensure regular water availability due to uninterrupted power supply, reduce the current burden on the water source and increase water supply to another 7000 rural dwellers in adjoining communities.

Dako Foundation for Rural Healthcare and Education (DFRHCE) wishes to thank you- our esteemed donors for your immense support so far in completing the first phase. With this attention for continuous support and the need to make our rural communities a better place, DFRHCE believes the solar panel phase of the water project is achievable if the funding commitments is sustained and thus use this medium to urge our existing donors and call for new donors to join in making this second phase water project a reality.

Rationale for the water project

In Nigeria, access to safe and regular water supply is a major challenge as clean and regular water supply have not kept pace with the rapid rate of population increase. Water scarcity, poor water quality and inadequate sanitation negatively impact food security, livelihood choices and educational opportunities for poor families and lead to water borne diseases such as diarrheal, cholera, typhoid, hookworm etc. This situation is particularly worse in underserved rural communities where most of the children die due to preventable diseases associated with inadequate water supply, sanitation and hygiene. This situation is very rife in the communities where DFRHCE implements a water project to serve 13,000 rural dwellers.

Project Overview

Construction of a 40 feet (ft) high scaffolding at the artesian water source in order to carry 10,000Litres of water reservoir, solar panel installation and water distributed through extension pipes to six (6) other neighbouring communities at a distance of 5 kilometers.

Project Location: Iyerekhu, Edo State, Nigeria.

Project Reach: The project is expected to provide water supply to reach 13000 people in total; 6000 people in its primary community and another 7000 residents through its water extension from the source to neighbouring communities.

Project Implementation Successes.

The first phase of the water project has been successfully completed and commissioned. Activities carried out in this first phase include.

  • Project site preparation and maintenance
  • Fully installed artesian water source with completed plumbering
  • Construction of basement for water scaffolding
  • Construction of a 40ft high steel scaffolding
  • Provision of 10,000L water storage
  • Extension pipes to two community water sources.
  • Completed two fully tiled community water extension platforms
  • Completed; four community taps

 

Next phases of the water project:  Solar Panel Installation and Water Extension

  • Solar panel installation (second phase)
  • Water extension through pipes (third phase).

These are aimed to provide uninterrupted power and increase water supply to another 7000 rural dwellers respectively. The second and third stages when completed would reach a larger number of people including farmers and school children who continuously get late to school due to long distance walk to fetch water several times daily before attending school etc. This water extension project is expected to benefit communities and end their lingering inability to access regular potable water supply.  Being the first of its kind in providing water supply across communities. With continuous support, we hope to replicate this project in other communities that lack access to water supply.

While we welcome donations at any point, targeted donations often make more funds available for our project. To mark the ongoing End of Year Donation Period, GlobalGiving will be providing opportunity to boost all funds donated to our project between November 28th – December 31st, 2018. We will be glad to maximise this great opportunity.

Our donation link https://www.globalgiving.org/projects/potable-water-supply-to-13000-villagers-in-nigeria/ is still active on GlobalGiving and opens for donations.  Please donate now. The donations would help ensure timely and successful completion of the next phases of the water project to 13,000 rural dwellers.

Thank you for your donations towards providing potable water to 13,000 rural dwellers in Nigeria. The successes recorded so far have been made possible due to widespread donations from all our donors in the UK, Canada, Australia, Europe, America, South Africa and Nigeria. Your donations, irrespective of the amount, helped us achieve these successes. While we hold all donors in high esteem, we will as well not forget to appreciate one of our major donors, Dako Medical Centre Limited (Nigeria) for its immense contribution towards the completion of the first phase of this project especially during times of low funding challenges and the urgent need to provide water to the immediate host community.  We look forward to continued support from all our donors as we further provide potable water to underserved communities in Nigeria.

Thank you,

Dr Mamudu Dako

Founder/CEO, Dako Foundation for Rural Healthcare and Education (DFRHCE).     

Community water source: terminal 2
Community water source: terminal 2
residents continue to access water source
residents continue to access water source
Commissioning of the First phase of water project
Commissioning of the First phase of water project

Links:

Sep 11, 2018

7 months after first phase project completion

Rural residents fetching water
Rural residents fetching water

Its over 7 months since the completion of the first phase of the community water project to provide potable water to 13,000 rural dwellers in Nigeria. Rural residents continue to benefit from the water supply. However, there is a challenge of irregular power supply as the second phase (Solar panel Installation) has witnessed low progress due to lack of funding. 

The first phase of the water project since its completion continues to be a major source of water to its primary community and environs. Also, there is an increasing burden on the water source as the population it serves continues to increase. The challenges of irregular power supply and the cost of over reliant on generator further buttress the urgency to complete the second phase (solar panel installation) of the project. This will ensure regular water availability due to uninterrupted power supply, reduce the current burden on the water source and increase water supply to another 7000 rural dwellers in adjoining communities.

Despite lack of funds for the second phase of the project, Dako Foundation for Rural Healthcare and Education (DFRHCE) specifically thank you- our esteemed donors for your immense support so far in completing the first phase. With continuous support and the need to make our rural communities a better place, DFRHCE believes the solar panel phase of the water project is achievable and hopes to replicate this project in the future, to other communities that lack access to water supply.

Rationale for the water project

In Nigeria, access to safe and regular water supply is a major challenge as clean and regular water supply have not kept pace with the rapid rate of population increase. Water scarcity, poor water quality and inadequate sanitation negatively impact food security, livelihood choices and educational opportunities for poor families and lead to water borne diseases such as diarrheal, cholera, typhoid, hookworm etc. This situation is particularly worse in underserved rural communities where most of the children die due to preventable diseases associated with inadequate water supply, sanitation and hygiene. This situation is very rife in the communities where DFRHCE implements a water project to serve 13,000 rural dwellers.

Project Overview

Construction of a 40 feet (ft) high scaffolding at the artesian water source in order to carry 10,000Litres of water reservoir, solar panel installation and water distributed through extension pipes to six (6) other neighbouring communities at a distance of 5 kilometers.

Project Location: Iyerekhu, Edo State, Nigeria.

Project Reach: The project is expected to provide water supply to reach 13000 people in total; 6000 people in its primary community and another 7000 residents through its water extension from the source to neighbouring communities.

Project Implementation Successes.

The first phase of the water project has been successfully completed and commissioned. Activities carried out in this first phase include.

  • Project site preparation and maintenance
  • Fully installed artesian water source with completed plumbering
  • Construction of basement for water scaffolding
  • Construction of a 40ft high steel scaffolding
  • Provision of 10,000L water storage
  • Extension pipes to two community water sources.
  • Completed two fully tiled community water extension platforms
  • Completed; four community taps

 

Next phases of the water project: Solar Panel Installation and Water Extension

  • Solar panel installation (second phase)
  • Water extension through pipes (third phase).

These are aimed to provide uninterrupted power and increase water supply to another 7000 rural dwellers respectively. The second and third stages when completed would reach a larger number of people including farmers and school children who continuously get late to school due to long distance walk to fetch water several times daily before attending school etc. This water extension project is expected to benefit communities and end their lingering inability to access regular potable water supply. Being the first of its kind in providing water supply across communities. With continuous support, we hope to replicate this project in other communities that lack access to water supply.

While we welcome donations at any point, targeted donations often make more funds available for our project. To mark the Global Bonus Day, GlobalGiving will be providing a 33 hours opportunity to boost all funds donated to our project between September 12th – 13th, 2018. We will be glad to maximise this great opportunity.

Our donation link https://www.globalgiving.org/projects/potable-water-supply-to-13000-villagers-in-nigeria/ is still active on GlobalGiving and opens for donations. Please donate now. The donations would help ensure timely and successful completion of the next phases of the water project to 13,000 rural dwellers.

Thank you for your donations towards providing potable water to 13,000 rural dwellers in Nigeria. The successes recorded so far have been made possible due to widespread donations from all our donors in the UK, Canada, Australia, Europe, America, South Africa and Nigeria. Your donations, irrespective of the amount, helped us achieve these successes. While we hold all donors in high esteem, we will as well not forget to appreciate one of our major donors, Dako Medical Centre Limited (Nigeria) for its immense contribution towards the completion of the first phase of this project especially during times of low funding challenges and the urgent need to provide water to the immediate host community. We look forward to a year of continued support from all our donors as we further provide potable water to underserved communities in Nigeria.

Thank you,

Dr Mamudu Dako

Founder/CEO, Dako Foundation for Rural Healthcare and Education (DFRHCE).                                          

 

click the link below for video showing community residents fetching water from the completed first phase of water project.

 

https://www.facebook.com/dakofoundation/videos/284992232029488/?hc_ref=ARQq_v0nEq7Y4UofD8P7m5oCWV-Dvb9NmCaw414iflwAkAPb73KV7qKjJNfFnVr80y0&fref=nf

Residents from far communities come to fetch water
Residents from far communities come to fetch water
Residents store water in drums
Residents store water in drums
Water source when commissioned in February 2018.
Water source when commissioned in February 2018.
 