As noted in our last report, our contractor, Baker Renewable Energy (BRE), completed its engineering study which indicated that the office roof complex be used, while including modest cost for the roof repair needed to support rack-based PVC system. The proposed system included 24 Canadian 210W PVC panels and micro-inverters with 25yr/10yr (respective) warranties, yielding approximately 500kWHours power per month (conservative). Baker contacted Belize Energy and Light about meter hookup, and those negotiations are proceeding.

The Holy Cross Educational Foundation reviewed and accepted Baker's proposal after modest additional cost savings were obtained by Baker -- an effort much appreciated by the Foundation. The proposal was accepted in mid-January, and Baker promptly got to work pulling together all relevant supplies from the various vendors. A large shipping pallete including all the solar panels and ancillary equipment was packaged and shipped to Amarillo Texas, where it was received by an ecumenical Christian shipping ministry, "The Word at Work (TWAT). TWAT included the pallet among an entire container truck of donated materials and arranged for shipping to Belize. The cargo ship carrying the container left port in Houston in late February, arriving in Belize toward the end of March.

Once the container truck was offloaded, our pallet was embargoed in Belizean customs until a waiver-of-duty letter was graciously provided by the local (Anglican) Bishop of Belize. The pallet was formally released without a fee to the local Belize City TWAT employee on Tuesday, April 19, at his warehouse. Board member John McHenry procured the needed forklift with the help of a local Belizean contact, which allowed the pallet to be re-trucked intact to the Carribbean Depot barge company in Belize City, where it was loaded onto a barge for the short journey out to Ambergris Caye. It reached port south of San Pedro on Wednesday evening April 20, and was trucked to the school on Thursday morning April 21.

There, an inventory was conducted showing that nothing on the bill of lading was missing or broken, save one set of tracking rails, which were later located at Carribean depot -- as they had been shipped separate from the pallet itself.

This put the project about 2 months behind the originally published schedule, which was targeting April for Site work and installation and May 1, 2012 for power on and the conclusion of Phase 1.

During early May, BRE sent two technicians to Holy Cross to complete the roof repair and preparation work that was identified in the site engineering report. This work is now done. BRE is looking at mid-to-late June to make a final install and power-on trip -- with the hope of formal project conclusion by July 1, 2011. BRE has been extremely responsible to work with including significant in-kind donations for engineering, site visits, and repair/installation activities that have resulted in our ability to stay within our initial budget estimates.

We are extremely excited to reach this point in our Phase 1 project, and are deeply thankful to our many supporters for making this possible on behalf of the children at Holy Cross Anglican School.

unloading pallet of solar equipment at HCAS
unloading pallet of solar equipment at HCAS
Continued unloading of solar equipment
Continued unloading of solar equipment
solar equipment awaiting storage at HCAS
solar equipment awaiting storage at HCAS
moving solar panels into safe storage
moving solar panels into safe storage
moving solar panels into safe storage (2)
moving solar panels into safe storage (2)
roofing section needing repair (BRE trip)
roofing section needing repair (BRE trip)
tearing out section of roof needing repair
tearing out section of roof needing repair
installing proper drainage on roof
installing proper drainage on roof
roofing section after repair (1)
roofing section after repair (1)
roofing section ready for solar panel install
roofing section ready for solar panel install
Comments:

About Project Reports

Project Reports on GlobalGiving are posted directly to globalgiving.org by Project Leaders as they are completed, generally every 3-4 months. To protect the integrity of these documents, GlobalGiving does not alter them; therefore you may find some language or formatting issues.

If you donate to this project or have donated to this project, you will get an e-mail when this project posts a report. You can also subscribe for reports via e-mail without donating or by subscribing to this project's RSS feed.

An anonymous donor will match all new monthly recurring donations, but only if 75% of donors upgrade to a recurring donation today.
Terms and conditions apply.
Make a monthly recurring donation on your credit card. You can cancel at any time.
Make a donation in honor or memory of:
What kind of card would you like to send?
How much would you like to donate?
  • $10
  • $50
  • $75
  • $100
  • $300
  • $600
  • $1,200
  • $10
    each month
  • $50
    each month
  • $75
    each month
  • $100
    each month
  • $300
    each month
  • $600
    each month
  • $1,200
    each month
  • $
gift Make this donation a gift, in honor of, or in memory of someone?
green leaf

Certified Green Project

This project is certified GlobalGiving Green for addressing climate change sustainability.
Learn more.

Organization

Project Leader

John McHenry

Eden Prairie, MN United States

Where is this project located?

Map of Provide electricity to 500 students in Belize