Clean Water Now Flowing and Our Goals for 2010

Susana will now grow up with clean water directly at her home.
Susana will now grow up with clean water directly at her home.

In December of 2009, for the first time in the 47 year history of the community of Tayakome, clean water flowed throughout the village reaching 190 people, 15 homes, the school, and medical post. Phase One of our integral indigenous health programming is now complete through the combined efforts of HOTC's skilled technical team, the community members and children, and Global Giving donors! A gravity flow water system was built and slow sand filtration was installed to accommodate population growth up to 350 people. Fifteen homes also received a tap stand with an underground greywater drain. A utility sink was built at the schoolhouse, and water finally arrived to the medical post that was built 6 years prior, and had been operating without sanitation services. Our work, which inspires the children and people of Tayakome to achieve their greatest potential, simply would not have been possible without your generous support. The lives of the children and the people forever transformed for the better, because of YOU! Goals for 2010

Sanitation Infrastructure: Construction of flush latrines (separate sides for boys and girls) with an eco-friendly septic system at the village schoolhouse, and a utility sink at the preschool. Health Education: Health education classes for the mothers and children in partnership with the health personnel at the medical post and village school teachers. Technical and Vocational Training: Training in water and sanitation systems repair and maintenance for the village based water committee. Construction of the bathrooms and utility sink will begin on April 1st, 2010, and is scheduled to be completed by July 31st 2010. Our health education and technical training classes will be ongoing throughout the year. Know that your ongoing support through Global Giving of the children and people we serve in this remote rain forest of Peru is greatly appreciated and valued. We are in need of an additional $50,000 to reach our goals for 2010. Every dollar you donate helps ensure a healthier life for the children and people of Tayakome for generations to come. Thank you for your generosity!

Blessings to you all, Nancy Santullo

Executive Director House of the Children

Primary school children performing maintenance on their new sink
Primary school children performing maintenance on their new sink
Cable bridge was constructed to flow water to the community
Cable bridge was constructed to flow water to the community

Links:

Dec 4, 2009

Project Tayakome Update

Cable Bridge that flow water to the community.
Cable Bridge that flow water to the community.

Dear Friends,

In November of 2007, HOTC's team made a journey deep into the primary rain forest of Manu to assess the health needs of the native Matsigenka village of Tayakome. It was on that day that Hilario, a man from the village, filled with emotion, raised his voice at our community meeting, and said, "we want a better life for our children, and are willing to work hard together to achieve clean water."

We are proud to report that after 17 months of development on August 24, 2009 HOTC has officially broke ground in Tayakome. This is the first time in the history of the Manu Park, established in 1973, that indigenous people in the protected zone, will be empowered by sustainable health infrastructure, clean water, sanitation and health education. We are all very excited!

Our Services for Tayakome are: • Equal access to SAFE drinking water throughout the community. • The construction of a communal gravity flow water system. • Sturdy tap stands with an eco-friendly underground greywater drain at each home. • Stone utility sinks at the village schoolhouses. • Bathrooms that include flush latrines with eco-friendly septic system at the school grounds. • Weekly health and hygiene classes for the children and monthly classes for the mothers. • Baseline health assessments which include parasite and anemia testing to monitor the health advances in the community. • Technical training for the village based water committee and health personnel in health infrastructure, construction and water safety. • Partnerships with the health and education ministry for long term health advances and project sustainability.

Phase One: Construction of the gravity flow water system and slow sand filtration, 15 tap stands and 2 utility sinks with underground greywater drains, and base line health assessment is scheduled to be competed by Dec 30, 2009.

There are 190 people living in Tayakome; 110 of them are children under the age of 15. The water system is accommodating all the people, and will allow for a 5% growth rate per year over 15 years.

Our Project Advances:

• 100kg of construction materials have been purchased and transported one day by land, and three days on the river by boat and are in the community. • 100% of the 3.5 km water distribution line has been laid throughout the village. • 100% of the 100,000 kg of stone for the greywater drains have been collected. • Water filtration system has been designed by our US environmental engineer, Humphrey Blackburn of Blackburn & Assoc. Humphrey's operations manager made a trip to Tayakome in late October, to assist our team in building the water filtration system. The Slow Sand Filters are now in place and functioning, with a storage tank holds 18,500 liters of safe drinking water.

• 15 Tap stands have been built at each home throughout the central community and the underground drain at each tap to dispose of grey water will be finished by the 15th of Dec.

• Health examinations were conducted in November for all children and families which included anemia and parasite base line testing.

• Our Medical Anthropologist Glenn Shepard Jr. Ph.D spent six days in the community at the end of August documenting the social impact of our program.

Our advances continue to be steady as we are now flat up rainy season. Our team remains united the villagers dedicated to completing this first phase of the infrastructure in their community by the 15th of December.

We are 80% there, and are in need $30,000 complete this first phase of programming, which is flowing clean water to 15 homes, the village schoolhouse and medical post, and includes health education classes and technical training for the village water committee.

Your generosity has been instrumental in HOTC achieving the above accomplishments. Know that every dollar you donate through Network for Good helps to ensure a healthier life for the children and people of Tayakome.

Thank You and Bless You all for what you are facilitating for the people of Tayakome and we look forward to your continued support as we serve humanity in this remote and special part of our world.

We wish you all a warm holiday season filled with love and all things bright.

Love and Blessings, Nancy Santullo

Project forman pouring the floor for the sink at schoolhouse.
Project forman pouring the floor for the sink at schoolhouse.
Base line testing for anemia.
Base line testing for anemia.
Jul 27, 2009

Project Tayakome Update

Executive Director meeting with Chief of Tayakome.
Executive Director meeting with Chief of Tayakome.

Our HOTC team made a technical visit to Taykome in early July to arrive at a formal agreement with the community. HOTC conducted two community meetings in partnership with the village chief. These meeting were translated from Spanish to Matsigenka, and had great attendance turnouts by the community members. We also made house to house visits to speak with each head of household to discuss the building of their tap stand.

HOTC executive director Nancy Santullo walked every meter of the terrain where the water lines will be laid, with project foreman, Caleb Matos Chavez, and community members discussing in detail project execution. Our technical team also made house-to-house visits to conduct soil percolation tests that measured the absorbency of ground for our greywater drains. This testing was labor intensive due to the fact that the men and children of the community had to haul huge pots and containers of water from long distances to fill the test hole which were 2 ft deep x 2 ft long x 16 in. wide. We accomplished a multitude of tasks, and gathered our final data necessary to complete our engineering design.

The people of the community were filled with excitement that construction of their gravity flow water system and tap stands will begin by August 20th, 2009. Tayakome will be the first native community in the protected zone of the Manu National Park to receive integral and culturally appropriate health services that respects their cultural and environmental needs. This is monumental to the history of a remote native community in the Manu Rain Forest Biosphere Reserve.

Our visit was nearly flawless. The rain stayed away, and our long river travel was executed perfectly. Our total travel time on the water was 5 days.

Many thanks to all of our GlobalGiving donors, for your generosity and friendship. Our year to date total of funds raised is $5100. We ask, however, for your continued support. We still have 95K to raise for the flow of clean water to become an reality for the people. Through sharing our abundance, we make our world a BETTER place for us all.

Thank you and Bless you all,

Nancy Santullo Executive Director

Villagers & HOTC at the point where the water will be captured f
Villagers & HOTC at the point where the water will be captured f
Villagers conducting ground percolation test for greywater drain
Villagers conducting ground percolation test for greywater drain

About Project Reports

Project Reports on GlobalGiving are posted directly to globalgiving.org by Project Leaders as they are completed, generally every 3-4 months. To protect the integrity of these documents, GlobalGiving does not alter them; therefore you may find some language or formatting issues.

If you donate to this project or have donated to this project, you will get an e-mail when this project posts a report. You can also subscribe for reports via e-mail without donating or by subscribing to this project's RSS feed.

Donation Options

Funded

Combined with other sources of funding, this project raised enough money to fund the outlined activities and is no longer accepting donations.

Still want to help?
Find another project in Peru or in Health that needs your help.

Organization

Project Leader

Nancy Santallo

Staff Member
Los Angeles,, CA United States

Where is this project located?

Peru   Health
Map of Clean Water and Sanitation -Rainforest of Peru