By Florinda Concepcion | Project Leader
Thank you for supporting the rehabilitation of the solar water pumping project in Paang Bundok. SIBAT engineers were able to repair the damaged solar panels and have now installed it in Paang Bundok. The technical work is now halfway through, made possible with your support that provided for the technical repairs and installation expenses of the project. As soon as possible, the water pump will also then be repaired that will then bring up the water directly from the spring to the storage tank for distribution to the 85 families in the village.
The next phase will be restoration of the water distribution system including the water pump equipment. SIBAT engineers – Carlo Fabia and Diana Benato have already designed the appropriate water system layout that will optimize the water distribution system.
Project reports on GlobalGiving are posted directly to globalgiving.org by Project Leaders as they are completed, generally every 3-4 months. To protect the integrity of these documents, GlobalGiving does not alter them; therefore you may find some language or formatting issues.
If you donate to this project or have donated to this project, you can receive an email when this project posts a report. You can also subscribe for reports without donating.