|
|
|
|
These villagers in Minaluha and Nagka are now able to fetch their water inside the village instead of hiking down slopes to get it. The whole system was completed June 2008.
|
|
|
|
|
|
With this new reservoir completed June 2008, water pumped 24x7 by the ram pump is accumulated for use during the day.
|
|
|
These pumps are operational since June 2008 and feed the twin communities of Minaluha and Nangka
|
|
|
|
|
|
|
|
|
Even though this is a drawing for a site that has now been funded, a similar design exists for the twelve villages, based on their specific landscapes.
|
|
|
|
|
|
|
|
|
To maintain the water resource and combat the effects of climate change and past deforestations, native trees seeds are collected and grown in a nursery, then thousands of trees are planted in the watershed.
|
|